Saturday, June 20, 2009

Saturday, June 20, 2009




Work continued at the Memorial Annex this week. We took a break for a week after the Spring Fling but there is always work to do at the Annex.

8 buses were moved back into the Annex. The floor was cleaned with a leaf blower to remove dog hair and other debris. The floor in the "shed" was patched. Trash was removed and
dumped. The pit was uncovered and pumped out. If the weather would cooperate, the grass will be needing mowing soon too.

In the Susquehanna Valley, as in other parts of the East Coast--we have had rain almost the whole month of June--hard to keep up on the grass mowing when everything is wet.

No comments:

Post a Comment