Power washed annex north side wall. Pit covers and pit steps power washed.

Bonanza: All systems checked and bus is ready to be moved. Moved outside under its own power.

Williamsburg: Engine, trans, & fuel drained.


Power washed the east half of the annex floor, except for the floor between the pit and the office, and the east side wall. Floors and walls cleaned with cleaning solution and brush. Floor squeezed.

Williamsburg: Bus raised additional height to access rear. Rear drained.

CAT Fishbowl: Air line from main compressor replaced. Brakes freed up. Bus moved outside under its own power.

Moved all items from west side of building to east side in preparation for floor cleaning. Some parts put in trailers.

Trash and hazmat disposed of by Ed Wolf.