Tuesday, September 20


Certified electrical inspector installed the “certification” form, as instructed by PPL in a plastic sleeve by the meter box.

Buses opened remained that way to dry out


Wednesday, September 21


PPL called back, from Tuesday call advising them that certification form was at the building – all items in order – power should be on by midday.


T. Collins stopped by the Annex at 4:15pm--no new meter and still no power (noted that none of the surrounding homes have power either). One home two doors away has a generator but no PPL service to date.


Trash along Union Deposit Road (including ours deposited on Saturday) remains there--also noted several homes further east were being torn down completely.


Donations, from MBT members starting to flow in. Not in large amounts but flowing. Thank you!


Power, at this juncture, is an issue. T. Collins will call again tomorrow (Thursday).